What does cycle time per part mean?
Time for a single workpiece from main time and side time, often supplemented by a distribution time surcharge. Set-up time plus cycle time per part times lot size results in the application time.
The cycle time per part is the time that a single workpiece needs on the machine: main time plus side time, often supplemented by a supplement for distribution times such as small faults and waiting times. It is the value multiplied by the lot size.
T_contract = t_r + m × t_piece
Set-up time t_r once per job, cycle time per part t_piece per part, quantity m.
Unit time in production and calculation
Set-up time plus unit time times Lot size results in the order time. If the set-up time is additionally distributed among the parts, the time is generated per part, with which unit costs and differential prices are expected.