Production strategy and tool selection matching the component
The production strategy lies between component analysis and a reliable time calculation. CNC Kalkulator prepares a comprehensible processing sequence for this. Recognized geometry and drawing features are combined with material, machine and the released tool and cutting data of your operation.
Depending on the component, steps such as tarpaulining, roughing, finishing, drilling, threading or deburring can arise. Work preparation checks how many stresses are required, which characteristics are worked together and whether the proposed tools fit the machine and the material. Additional stresses, difficult-to-access areas, tight tolerances or special surface requirements remain visible as time and cost drivers.
If a suitable tool is missing or if a requirement is outside the well-kept area of application, this is marked openly. Thus, your team receives a useful proposal without pretending to be complete planning for security. Detailed CAM planning is required for complex free-form surfaces, special tools or unvalidated multi-axis machining.
Only the professionally confirmed strategy flows into processing time and costs. Changes to the machine, tool sequence or tension update the calculation comprehensible. Alternative production paths can also be compared without overwriting the released initial level. This facilitates the coordination between calculation and work preparation and creates a clear basis for further planning.
Starting values for cutting speed and feed per material are shown in the Cutting data calculator, which calculates speed per tool diameter Speed.
Benefits for your team
Production strategy reduces search work, makes assumptions comprehensible and creates a reliable basis for the offer.
Structuring the work sequence
Recognized features are assigned to appropriate processing steps and clampings.
Include your own tools
Proposals take into account machine, material and the areas of use released during operation.
Compare alternatives
Different strategies can be calculated separately and evaluated professionally.


