BDE, MES and ERP times will only be comparable after professional mapping
ERP describes order, position and quantity. BDE or MES provide messages about machine, start, end, quantity and fault. Common identifiers and a clear time logic combine this information with the calculation.
Import rules deal with pauses, parallel orders, correction bookings and missing logouts. Only verified records are used as an actual reference for future calculations.
Key points
Interfaces are explained in such a way that inputs, procedures, effects and limits in the CNC calculation remain comprehensible.
- Connect IDs: Clearly link the job, operation, machine and component.
- Time logic: Evaluate the duration, staffing time, fault and break separately.
- Treat error: Check multiple log in and open booking visibly instead of silently correcting.