Sharing preparation into comprehensible work steps
Drawing analysis, CAM programming, simulation, postprocessor run and set-up documents can take place independently of the machine. On the other hand, entry usually additionally binds a machine. The programming cost calculator evaluates these steps separately and shows the sum as well as the proportion of the selected job.
The inputs are own time assumptions or measured values. A complex drawing does not automatically lead to a specific programming time in the computer; the specialist assesses the effort.
Evaluate personal time and machine occupancy correctly
In the preparatory steps the computer uses the programming hourly rate. When entering the machine hourly rate, it adds the machine hourly rate. The machine set entered there must therefore not already contain the same programmer completely. Otherwise, personnel costs would be counted twice.
Equipment, start-up and initial sample testing are clearly defined in the operational calculation. An activity already included in the setup time approach is not re-recognised as a programming position.
K_Program = ̄(t_preparation × S_Program ÷ 60) + t_initiation × (S_Program + S_machine) === 60
Sample calculation for a job with 25 parts
20 minutes of analysis, 90 minutes of CAM, 20 minutes of simulation and ten minutes of documentation are 140 minutes of preparation. With 70 €/h assumed, 163,33 € are created. Another 30 minutes of entry to a total of 125 €/h cost 62,50 €.
A total of 170 minutes of effort and 225.83 € programming costs. In 25 parts, 9.03 € per part is generated. The rounding is only made for the display; the total amount is expected to be unrounded intermediate values.
Consciously consider repeat jobs
If the same total cost is distributed over three expected equivalent orders, the calculation of the total cost is €75.28 per order or €3.01 per part for each 25 parts. This does not reduce the cost: If follow-up orders remain, they may not be fully covered.
New revisions, other machines or changes to the clamping concept can cause new work. Therefore, an existing program does not automatically mean that the subsequent order does not contain any programming costs.
Sources and classification
- REFA: set-up time
Delimitation of one-off order preparation. The calculation examples and cost rates of this page are own illustrative assumptions.
- Knight / Boothroyd: Fundamentals of Metal Machining and Machine Tools
Study book principles for the economics of machining processes, especially Economics of Metal-Cutting Operations.
Questions and answers
Is it part of programming or setup?
Both operational assignments are possible as long as the costs are recorded completely and precisely once. This computer contains its own position for entry with programming and machine hourly rate.
Are the preoccupied times standard times?
No. They show a calculation path. Own documented orders and the actually required steps provide the appropriate basis.