Combining production processes: costs per operation

State:
AI-generated

Deriving the route from the part

A shaft can be sawn, turned, milled, heat treated and ground. A sheet metal part can be cut, bent, provided with press-in components and coated. The scope of delivery determines which steps are required; a solid process template does not replace this test.

Expect your own assumptions per operation

Each operation receives its machine or resource, set-up time, cycle time per part and cost basis. Production sequence, transfer quantity and necessary intermediate testing are explicitly specified. Different cost rates may not be grouped into an average set without weighting.

Saws and deburring can already be included in the material price, the measurement in the production cycle and third-party processing in a complete price. Such overlaps are clarified before adding.

Calculation example for two machines

An assumed route for 40 parts consists of 20 minutes of setup and three minutes of cycle time per part while turning to 80 €/h, 30 minutes of setup and two minutes of cycle time per part when milling to 100 €/h. This is 186,67 € and 183,33 €, together 370 € of time and 9,25 € per part.

This does not yet include material, additional testing, transport between external companies and profit. The values are a calculation example, not a performance commitment.

K_Time,Los = sum per operation [(t_Rüst + N × t_Stück) × set ÷ 60]

Differentiating working time and lead time

The sum of processing times describes effort and resource requirements. An agreed delivery date also depends on queues, availability, transport and external services. Parallel processes change the throughput time without necessarily reducing the total labour costs.

Single calculator for a verifiable basis

The free app supports the calculation of unit time, precalculation and costs with your input. For each variant, the values used remain decisive. A cost calculator does not plan an automatically released production route and does not guarantee a delivery date.

Questions and answers

Can a part of turning and milling be included?

Yes. The calculation has to take into account all actually required operations. Each step is evaluated with the appropriate times and cost rates.

Does the order time correspond to the delivery time?

No. Processing and setup times describe the workload. The delivery time also takes into account availability, waiting, transport and external appointments.

cycle time per part from operations in the CNC Calculator app

Adds processing times and non-cutting times to piece and order times.

Free piecetime calculator from operations in CNC Kalkulator with input and result
Calculate in the app

Free tools in your browser without sign-in

How the calculation from drawing, CAD model and your operating data looks like with you, we will gladly clarify on one of your parts: Book free first interview.