Calculation of assemblies: parts, assembly and testing

State:
AI-generated

Set parts list and production level

The calculation begins with a released list of parts and revision. Each position receives quantity per assembly, source and the evaluated delivery. A processed plate may not additionally enter the amount of the assembly with its raw material price.

Consumables, screws, adhesive, marking and packaging are included in the calculation if they are required for delivery. Purchase parts are included with the prices and purchase costs valid for the quantity.

Distinguishing assembly work and machine occupancy

A machine or device may be occupied in parallel; this proportion may only be calculated in addition if the rate used does not contain it. Curing or waiting time can increase the throughput time without being working continuously.

Example of calculation of a small assembly

Two manufactured parts of 8 € each and purchased parts for 3 € result in 19 € part costs. Ten minutes of assembly at 36 €/h result in 6 €, two minutes of testing at 48 €/h another 1.60 €. An accepted assembly preparation of 60 € distributed over 20 assemblies adds 3 € per unit.

This creates 29,60 € per assembly before overhead costs, packaging and profit that are not yet included. All figures are freely selected calculation values.

K_assembly = sum(quantity × part costs) + K_assembly + K_test + K_sault ÷ N

Calculate pre-assembly of turning and milling parts

If a finished turning and milling part is not supplied individually, but pre-assembled, then the part calculation includes joining, pressing, screwing, securing, testing and marking. As in the example, these steps are evaluated as personal time per assembly, devices and setups of the assembly are distributed over the batch size.

The reference quantity is important: the part costs are included in the number of pieces per assembly, the scrap during joining, for example with press associations, can cost additional parts and is then charged as own acceptance.

What the app contributes to

The recorded values can be calculated with cycle time per part, order time and unit costs. These individual tools do not replace any parts list management, assembly instructions and automatic procurement. The technical and commercial basics are checked before the invoice.

Questions and answers

Is waiting time automatically pay time?

No. The actual staff engagement is evaluated. A waiting period can affect delivery date and documented resources without a person working for the entire duration.

How are self-made components taken into account?

With the already determined costs of the required revision and quantity. Included material and processing costs are not added again at assembly level.

cycle time per part from operations in the CNC Calculator app

Adds processing times and non-cutting times to piece and order times.

Free piecetime calculator from operations in CNC Kalkulator with input and result
Calculate in the app

Free tools in your browser without sign-in

How the calculation from drawing, CAD model and your operating data looks like with you, we will gladly clarify on one of your parts: Book free first interview.

Carlo D'Este
D'Este Solutions

Welcome to the CNC Calculator

We will be happy to help you with any questions regarding the app, pro or your calculation.

Questions? Call us!