Setting-up time

State:
AI-generated

What does set-up time mean?

Time, which occurs once per order, to prepare machine, clamping agent, tools and program and then to equip. Dipped by the lot size, it results in the set-up percentage per part, which determines the price for small quantities.

The set-up time includes all activities that occur once per job to bring a machine from the last part of the previous job to the first part of the new one: set up clamping devices and tools, load program, set zero points, check the first part and then equip it. Internal set-up steps require the standing machine, external can be prepared while still running.

Precipitation per part = t_r ÷ Lot size

The set-up rate is the proportion of the set-up costs per piece.

Preparation time in production and calculation

In the case of small quantities, it shapes the unit price, and in large cases it hardly matters. In the labour law, "Rüstzeit" means something else, such as the creation of work clothes; here the machine fitting time is meant.

Set-up costs per order and piece in the CNC calculator app

When the set-up time is composed of individual steps, it is evaluated with machine and wage rate and distributed over the lot size.

Free set-up cost calculator in CNC Kalkulator with input and result
Calculate in the app

Free tools in your browser without sign-in

We are happy to clarify in person how set-up time goes into your own calculation: Book a free consultation.

Carlo D'Este
D'Este Solutions

Welcome to the CNC Calculator

We will be happy to help you with any questions regarding the app, pro or your calculation.

Questions? Call us!