Determine the scope of the verification before the cost calculation
The characteristics, parts and documents to be checked follow from the drawing, agreement and approved test plan. Cost optimization does not define this scope. Initial samples, series testing, incoming goods and documentation can be different tasks.
A sample calculator shows acceptance risks under its conditions. It does not provide automatic release, critical characteristics to be examined less rarely.
Separate preparation and recurring measurement
Create a test program, prepare, set up and document measuring devices once per lot or revision. Measuring time, handling and recurring documentation are part of the tested parts. A measurement time already included in the production cycle must not be additionally calculated.
Example of a lot
For 200 delivered parts, 20 parts are tested in a freely selected example with three minutes each. 30 minutes of test preparation together result in 90 minutes. At 60 €/h, the test costs 90 € for the lot and thus 0.45 € per delivered part.
In the case of a full test, it would be 630 minutes, 630 € and 3.15 € per part with the same time assumptions. The comparison only shows the cost effect; it does not justify a change in the approved test size.
K_Test per delivery part = (t_preparation + N_tested × t_test) × set ו (60 × N_delivery)
Foreign testing and testing equipment
For external measurement, the specific offer price, minimum order value, transport and necessary repetitions apply. Acquisition or calibration of test equipment is only additionally recorded if it is not already included in the test site cost rate.
Questions and answers
Do I share the test costs by the sample or the delivery quantity?
For the share of costs in the offer, the total inspection costs are distributed over the delivery quantity. Costs per part actually tested are a different characteristic and must be described as such.
Can the cheaper test scope be taken over directly?
No. Audit obligations and approved audit plan determine the permissible scope. The cost invoice assesses a specified scope.