Calculation in contract manufacturing: offer for individual parts and series

State:
AI-generated

Offers for individual parts and series in contract production

A calculation in contract manufacturing is loadable if it translates the requested execution into a plausible production route and derives from it costs and selling price. CAD model, drawing and inquiry must describe the same drawing level; material and delivery condition, number of pieces or scale, date, provided services and test requirements belong to this. Missing information is not replaced by unnoticed standard values, but is carried out as a query or explicitly to be released.

From the request package to the work plan

The preliminary work plan is created from the complete request: stock, process, machine, number of clampings, tools and processing sequence. Tolerances, fit, surfaces and mould or position requirements can require additional levelling and testing steps. External services such as sawing, hardening, grinding or coating are in the process with price, duration and responsibility. Side parts change the scope: If the customer delivers the material or the prefabricated part, only the requested operations are calculated, with goods receipt and final inspection.

Example of calculation: Individual part and series in comparison

The same rotating part as under Calculation turned parts, this time with a heat treatment as foreign power: 0.80 € per piece, at least 150 € per application. Rod section Ø 40 × 62 mm made of steel to 2.40 €/kg, 90 minutes set-up, 4.3 minutes main and side time per piece, 72 €/h for machine and operator, 18 % overhead costs, 12 % margin from the selling price.

Offer for one turnpiece in contract manufacturing
Position20 pieces500 pieces
Material (strip)1,47 €1,47 €
Equip per piece (90 min × 72 €/h ÷ quantity)5,40 €0,22 €
Unit time (4.3 min × 72 €/h)5,16 €5,16 €
Other performance Hardening per piece7,50 €0,80 €
Manufacturing costs19,53 €7,64 €
General expenses 18 %3,52 €1,38 €
Cost of production23,04 €9,02 €
Price at 12 % margin26,19 €10,25 €

For 20 pieces, the set-ups and the minimum amount of hardening make up about two thirds of the manufacturing costs; for 500 pieces, both hardly play a role. Example of calculation with round assumptions, no market prices; sums are made of unrounded values. The complete scheme up to the list price with discount and discount shows the page Offer calculation.

Typical errors in the supply calculation

  • Setup and programming are included in a flat rate supplement. Then the price does not fall at a larger amount, and the item is offered too cheap.
  • The margin is added to the cost of production rather than to the selling price. 12 % surcharge gives only about 10.7 % margin.
  • In the case of small lots it is often greater than the unit price times quantity.
  • batch prices are calculated from a price, or down, instead of calculating any quantity with their own set-up.
  • Revision, material condition and assumptions are not documented. In case of a question or a new drawing revision, it is no longer possible to say what the price is based on.
  • Overhead costs are charged twice, once per hour and once as a supplement.

Release and recalculate price

The offer price is generated from cost-effectiveness, documented risks and commercial objectives. A clear release shows not only the final sum, but also open assumptions and price-determining positions. After production, the target-actual comparison shows whether time models, master data or work plans have to be adjusted. Delivery capability, capacity, contract conditions and strategic price decisions remain tasks of the company.

In Pro, the CNC Calculator app creates the work plan with times, costs and scale from drawing and STEP model fully automatically as a calculation design, including the order scope for side parts; you check and release. Pro is unlocked on request. More information under Full automatic calculation from drawing and CAD.

Key points

Offers are explained in such a way that inputs, procedures, effects and limits in the CNC calculation remain comprehensible.

  • Complete request: Revision, quantity, material, delivery status, date and test requirements are clarified before the calculation.
  • Planning production: Machines, stresses, work steps and external services form the technical basis of the offer.
  • Release price intelligible: Costs, risks and desired financial contribution remain visible separately and can be decided in a targeted manner.

Questions and answers

The most important practical questions on offers and the classification into a reliable calculation.

How do you calculate in contract manufacturing?

From the complete request derive a work plan, expect main, auxiliary and set-up times per work, evaluate with the own rates and supplement material, external services, overheads and margin. One-off costs are distributed separately for each quantity offered.

Why is the item so expensive in contract manufacturing?

Because setups, programming and minimum amounts of external performance are entirely accounted for by a few parts. In the example, the same rotating part costs €26.19 at 20 pieces and €10.25 at 500 pieces per piece.

What's the difference between bonus and margin?

A premium is calculated on the cost of production, the margin is the share of profit in the selling price. A premium of 12 % is about 10.7 % margin; whoever wants a margin of 12 % divides the cost of production by 0.88.

Supply calculation in the CNC Calculator app

Calculates several items including one-off costs, discounts, freight and VAT.

Free quotation calculation in CNC Kalkulator with input and result
Calculate in the app

Free tools in your browser without sign-in

Questions about offers in your own calculation we will gladly clarify personally: Book free first interview.

Carlo D'Este
D'Este Solutions

Welcome to the CNC Calculator

We will be happy to help you with any questions regarding the app, pro or your calculation.

Questions? Call us!