What does peak time mean?
Time in which the tool is spanned with feed, turning per cut t = L / (n × f), milling t = L / vf. Tool change, rapid movement and measurement are not included, but at the side-time.
The main time is the time when the tool actually removes material, i.e. is in action with feed. It follows from the feed path and the feed speed, when turning each cut from length, speed and feed per turn.
Rotating: t_h = L × i ÷ (n × f) · Milling: t_h = L × i ÷ vf
L Feeding distance in mm, i Number of cuts, n Speed in 1/min, f Feed per revolution in mm, vf Feeding speed in mm/min.
Main time in production and calculation
Rapidity, tool changes, measuring and clamping are not part of the main time, but part time. The main time and part time together result in the cycle time per part, with the set-up percentage per part the time that enters the price.